Cisco Lake (Brazos River Basin)

Cisco Lake (also known as Williamson Dam) is located about four miles north of Cisco in Eastland County, on Sandy Creek, a tributary of Hubbard Creek, which is tributary to Clear Fork Brazos River, which is tributary to the Brazos River.  The Lake is owned and operated by the city of Cisco for its municipal water supply.  The city obtained Permit No. 439 (Application No. 455) dated June 16, 1920 from the State Board of Water Engineers to construct a dam.  Construction of the dam was completed September 7, 1923 with impoundment beginning about the same time.  The dam was built higher than was first planned, so Permit No. 1131 dated December 20, 1929 from the State Board of Water Engineers was granted to amend Permit No. 439.  This Permit authorized creation of a reservoir to impound 45,000 acre feet of water. However, because of damage to the roadbed of the Missouri-Kansas-Texas Railroad resulting from backwater from Cisco Lake, the railroad obtained a court injunction against the city of Cisco ordering the operating level of the lake to be reduced to elevation 1,496.0 feet above mean sea level.  At this elevation the capacity of Cisco Lake is 8,800 acre feet, and the surface area is 445 acres.  Because of the reduced capacity of Cisco Lake, the City of Cisco applied and obtained a new Permit No. 1738, dated January 25 of 1955, from the State Board of Water Engineers that authorized the construction of a small channel dam on Battle Creek to store 110 acre feet of water to supplement the water supply.  The water is pumped through a 24-inch pipeline over a divide into an unnamed creek, then to Sandy Creek, then to Lake Cisco.  The diversion from Battle Creek started in May 1956.

Additional Information