The American Recovery and Reinvestment Act was intended to foster unprecedented levels of accountability and transparency in government spending.
The TWDB encourages subrecipients of ARRA funds to promote their participation through signage on construction sites.
Construction projects funded by ARRA must post a copy of the Davis-Bacon wage determination notice in a worksite place easily accessible to construction workers who are employed.
The following are resources for entities recieving ARRA funds through the TWDB:
- ARRA Program Guidance Manual
- The David-Bacon notice is downloadable here.
- The ARRA logo is downloadable here.
- The TWDB has developed supplemental guidance to provide assistance related to the Conformance Procedure (SF-1444) used to request additional wage classifications. The supplemental guidance document can be downloaded here. This information is also summarized in a PowerPoint presentation developed for use during Webinar training sessions. The PowerPoint slides can be downloaded here.









